Additional Information
Stock Code | RAB Design_GFL-LED-20W-120V-BRZ-LONG LEAD |
---|---|
Brand | Rab Design |
Family | GFL |
Part No | GFL-LED-20W-120V-BRZ-LONG LEAD |
UPC | 061184993175 |
Voltage (V) | 120-277 Volt |
Length (in) | 4.5'' |
Width (in) | 11.8'' |
Height (in) | 6.1'' |
Bulb Type | LED |
Lumens (Initial) | 1700 Lumens |
Color | Bronze |
Color Temperature (K) | 5000K Daylight |
Wattage (w) | 18 Watt |
Life Hours | 100,000 Hours |
Start Temp. (Max) | 40°C |
Start Temp. (Min) | -40°C |
Lens: | Heat and impact resistant,tempered clear glass lens. |
Finish | Powder coat paint finish. Standardc olour is bronze. Custom colour is available as a special order. |
Mounting | The GFL has a 1/2” NPTswivel arm with mounting plate. The fixture can be wall or ceiling mountedIt can also light. |
Warranty | 5 Years Warranty , LEDs are rated for a minimum of 50,000 hours . |
UL Listed | cULus |
Is DLC Approved | Yes |
Notes | For additional options and special quantity discounts, please contact our sales department 1-(855)-296-9508 x 101 or send email to cs@bulbspro.com |
GFL-LED20
The GFL is a rugged cast aluminum LED flood which delivers 1700 lumens. The fixture has a 1/2” NPT knuckle and comes complete with a round mounting cover plate for standard 4“ junction boxes. It is ideal for doorways, entrances, sign and landscape lighting.
HOUSING
Precision die cast aluminum with 1/2” NPT locking swivel arm. Housing and arm have a powder coat paint finish.
LENS
Heat and impact resistant, tempered clear glass lens.
LEDs
Six Cree LEDs, 1700 lumens, 5000k.
DRIVER
120-277 volts.
Mounting
The GFL has a 1/2” NPT swivel arm with mounting plate. The fixture can be wall or ceiling mounted. It can also be combined with various arms as a sign light.
FINISH
Powder coat paint finish. Standard colour is bronze. Custom colour is available as a special order.
BEAM PATTERN
NEMA 7Hx7V
LUMENS
1700